About Us Products Pressure Vessels Major Projects Manufacturing Trading Terms Management Systems News Careers Contact GreenPower
SAI Global Health and Safety OHSAS 18001
SAI Global Quality ISO 9001
SAI Global Environment ISO 14001

Kador's Steel is Now Green

Manufacturing Facilities

Kador maintains three well equipped manufacturing operations at Sumner Park, Carole Park and Sherwood near Brisbane, Australia.

Kador Workshop Kador Workshop

Sumner Park [14 Boron Street]

The Sumner Park facility is Kador’s main office and comprises a single bay of 1,000 sq m with two annexes each of 200 sq m on a site area of 1,800 sq m.
The main bay is serviced by two EOHT cranes of 5 and 8 tonne capacity, plus a number of jib cranes.

Summary > Sumner Park
Floor Area:
  • 1000 square metres;

Craneage:
  • 1 x 5 tonne;
  • 1 x 8 tonne overhead;
Equipment:
  • punches up to 12mm plate;
  • CNC plus 2 other mills;
  • 2 lathes to 2000mm;
  • radial drill with bed 2000 x 1000 size 75;
  • welders to 800 amp;

Carole Park [148 Cobalt Street]

Summary > Carole Park
Floor Area:
  • 1900 square metres in two bays;

Craneage:
  • 2 x 8 tonne overhead;
  • 1 x 20 tonne overhead
  • 1 x 10 tonne overhead
  • 1 x 5 tonne mobile plus 2.5 tonne forklift
Equipment:
  • Two boom welders plus 800 amp sub-arc;
  • Radial drill with bed 1500 x 1000 size 50;
  • Welders to 800 amp;

Sherwood [451 Sherwood Road]

Total factory area is approx 4000 sq m, all of which operate under overhead cranes (2 x 35 tonne cranes) and a series of lighter jib cranes.

Summary > Sherwood Bay 3 Summary > Sherwood Bay 2 and 7
Floor Area:
  • 1,600 sq mtrs;

Craneage:
  • 1 x 25 Tonne Crane;
  • 1 x 35 Tonne Crane;
Floor Area:
  • 2,000 sq mtrs (combined);

Craneage:
  • 2 x 10 tonne crane;
  • 2 x 5 tonne cranes;
  • 1 x 3 tonne crane;
  • 3000mm guillotine;
  • 1 x 50 tonne 3000mm press;